References

SOME OF OUR MOST IMPORTANT CUSTOMERS

Acciaierie Bertoli Safau spa
Pozzuolo del Fiuli (UD)

A2A energia
Brescia, Milano

Acciaieria Fonderia di Cividale spa
Tavagnacco (UD)

Acciaieria Arvedi s.p.a.
Cremona

Gruppo AFV Beltrame
Vicenza

GRUPPO T.O. DELTA S.P.A.
Trieste

Acciaierie Elettriche Gandossi
Nembro (BG)

Austrowaren
Vienna (Austria)

Carcano Antonio spa
Mandello lario (LC)

Cameron System srl
Cinisello Balsamo (MI)

Ferriere Nord spa
Osoppo (UD) - Potenza (PZ)

Fonderie Officine Marchigiane
Apecchio (PE)

G.I.I. TUBE
Potpican (Croazia)

Histria Tube (Labinprogress)
Italsider spa
Taranto – Piombino – Genova

Itla spa - Gruppo Falck
Oggiono – Milano

KME Italy
Fornaci di Barga (LU)

Lombarda Tubi spa
Lomagna (LC)

Lucchini RS Spa
Lovere (BG)

Lucchini Poland
Varsavia (Poland)

Metallurgica Tognetti spa
Lecco

R. Yugometal
Belgrado

Ring Rollers
Springs (South Africa)

Siemens vai
Varese

Techint
Milano

Tenaris
Dalmine (BG)

Trafilerie Gilardi srl
Sesto S. Giovanni (MI)

Trafilerie Scerelli srl
Annone (LC)

Trafilerie Industriali spa
Nervesa della Battaglia (TV)

ITALGRU
Ambivere

Trenitalia spa
T.T.N. SPA
Nerviano (MI)

U.S. Steel
Kosice (Slovakkia)

Acerbi Veicoli Industriali spa
Castelnuovo Scrivia (AL)

Alfa Laval
Monza

Ansaldo Componenti spa
Genova – Milano

B.F.E. SPA
Albano S. Alessandro - Bosisio

Borgonovo Ingranaggi srl
Birone di Giussano (MB)

Ercole Marelli spa
Sesto S. Giovanni (MI)

Fibre Ottiche Sud spa
Battipaglia (SA)

Meta
Modena

Metalfar Prodotti Industriali spa
Cesana B.za (LC)

Montefibre spa
Marghera (VE)

O.M.B. F.lli Biffi srl
Basiano (MI)

Radaelli Ce.Ti. srl
Cologno M.se (MI)

Ranger spa
Carate B.za (MB)

Sandretto Industrie spa
Collegno (TO)

Samis Systems srl
Biassono (MB)

Zincor Italia spa
Varzi (PV)

Ambiente 2000 (Gruppo Falck)
Trezzo sull’Adda (MI)

Atzwanger

Ecodeco GRUPPO A2A

Gruppo HERA

T7 GROUP
Varazdin (Croazia)

Arak Refinery
Arak (Iran)

Istituto Nazionale Fisica Nucleare
Genova

Dalena
Putignano

Azienda Energetica Spa
Bolzano

Azienda municipalizzata gas e acqua
Genova

Centrale elettrica Enel
La Spezia

Astaldi
Roma - Milano

Garbi Linea 5 (MM Milano)
Milano

Lucchini RS Spa
Lovere (BG)

Lucchini Poland
Varsavia (Poland)

M.N. Metropolitana di Napoli
Napoli

Arkema Group
Rho - Milano

Brianza plastica spa
Carate B.za (MB)

Camar spa
Figino Serenza (CO)

Cellulosa Calabra spa
Crotone (CZ)

Di.W.S. Plastic spa
Abbiategrasso (MI)

F.G.U.
Caracas (Venezuela)

I.B.M. Italia spa
(Milano)

Livio Fior
(Lussemburgo)

Mussi Bianchi Fossati CIB
Abdjan (Costa d’Avorio)

Peg Perego spa
Arcore (MB) – Lomagna (LC)

Pirelli Cavi e Sistemi spa
Milano – Arco Felice (NA) – Battipaglia (SA)

SCA Packaging Italia spa
Porcari (LU)

SACMI
Imola (BO)

Forge Fedriga
Cividate Camuno (BS)

Forgiatura Morandini
Cividate Camuno (BS)

DANIELI
Buttrio (UD)

COGNE ACCIAI SPECIALI
Aosta (ITALIA)

METALCAM
Breno (BS)

ZARMEN FPA
Wroclaw, POLSKA


WASTE HANDLING CRANES

SOME MOST IMPORTANT REFERENCES:

 

PROJECT T7

Year: 2010
Client: T7 Group

Final Client: T7 Group

Location: Varazdin, Croatia

Waste processed: Household Waste, MSW

Plant capacity: 100.000 tpa

Status of the plant: full operation

Cranes

N° 1 Reception Crane
Capacity: 8 t

Span: 23,20 mt

Grab: polip 4 M³

Pit crane: 40 t/h

Operation: automatic and manual mode

N° 1 Process Crane (Work in open Biodrying monoreactor)
Capacity: 8 t

Span: 23,20 mt

Grab: bivalve 4 M³

Pit crane: 60 t/h

Operation: automatic and manual mode

PROJECT DALENA

Year: 2011
Client: Dalena Ecologia

Final Client: Dalena Ecologia

Location: Barletta, Italy

Waste processed:PFU/RDF

Plant capacity: 80.000 tpa

Status of the plant: full operation

Crane
N° 1 Reception Crane

Capacity: 8 t

Span: 15 mt

Grab: polip 4 M³

Pit crane: 40 t/h

Operation: manual mode

PROJECT RIDA

Year: 2012-2013
Client: RIDA AMBIENTE

Final Client: RIDA AMBIENTE

Location: Aprilia, Italy

Waste processed: Household Waste, MSW

Plant capacity: 460.000 tpa

Status of the plant: full operation

Cranes
N° 1 Reception Crane

Capacity: 10 t

Span: 33 mt

Grab: polip 6

Pit crane: 90 t/h

Operation: automatic mode, manual only for maintenance or emergency

N° 1 Distribution Crane
Capacity: 12,5 t

Span: 13 mt

Grab: bivalve 8

Pit crane: 120 t/h

Operation: automatic, manual only for maintenance or emergency

N° 1 Load/Unloading biotunnels Crane
Capacity: 8 t

Span: 7,8 mt

Grab: bivalve 4

Pit crane: 60 t/h

Operation: automatic, manual only for maintenance or emergency

N° 1 Carriage for open doors biotunnels
Capacity: 20 t

Spam: 12 mt

Operation: automatic, manual only for maintenance or emergency


PROJECT MARISCINA

Year: 2013
Client: Helector S.A.

Final Client: Eko Plus

Location: Rijeka, Croatia

Waste processed: Household Waste, MSW

Plant capacity: 100.000 tpa

Status of the plant: full operation

Cranes
N° 1 Reception Crane

Capacity: 10 t

Span: 22,30 mt

Grab: polip 6

Pit crane: 50 t/h

Operation: automatic, manual only for maintenance or emergency

N° 1 Process Crane (Work in 13 box Biodrying)
Capacity: 14 t

Lifting lids: hoist 6 x 2 t

Span: 23,20 mt

Grab: bivalve 11

Pit crane: 90 t/h

Operation: automatic, manual only for maintenance or emergency

N° 1 Carriage Shredder
Capacity: 32 t

Span: 10+2 mt

Operation: automatic

PROJECT KASTJUN

Year: 2014
Client: Helector S.A.

Final Client:
County of Istria
Location: Pula, Croatia

Waste processed: Household Waste, MSW

Plant capacity: 100.000 tpa

Status of the plant: full operation

Cranes

N° 1 Reception Crane
Capacity: 10 t

Span: 22,30 mt

Grab: polip 6

Pit crane: 50 t/h

Operation: automatic, manual only for maintenance or emergency

N° 1 Process Crane (Work in 13 box Biodrying)
Capacity: 14 t

Lifting lids: hoist 6 x 2 t

Span: 23,20 mt

Grab: bivalve 11

Pit crane: 90 t/h

Operation: automatic, manual only for maintenance or emergency

N° 1 Carriage Shredder
Capacity: 32 t

Span: 10+2 mt

Operation: automatic

PROJECT SOFIA

Year: 2015
Client: Aktor S.A.

Final Client: Municipality of Sofia

Location: Sofia, Bulgary

Waste processed: Household Waste, MSW

Plant capacity: 410.000 tpa

Status of the plant: full operation

Cranes

2 Reception Crane
Capacity: 14 t

Span: 20 mt

Grab: polip 8

Pit crane: 50 t/h

Operation: automatic, manual only for maintenance or emergency

2 Process Crane (Work in 13+13 box Biodrying)
Capacity: 16 t

Lifting lids: hoist 8 x 2,5 t

Span: 33 mt

Grab: bivalve 12

Pit crane: 90 t/h

Operation: automatic, manual only for maintenance or emergency

PROJECT KOZANI

Year: 2016
Client:
Herhof GmbH
Final Client: Western Macedonia S.A. (“Authority”)

Location: Kozani, Greece

Waste processed: Household Waste, MSW

Plant capacity: 150.000 tpa

Status of the plant: full operation

Cranes
1 Reception Crane

Capacity: 40 t

Span: 20 mt

Grab: polip 8

Pit crane: 50 t/h

Operation: automatic, manual only for maintenance or emergency

1 Process Crane (Work in 13 box Biodrying)
Capacity: 14 t

Lifting lids: hoist 8 x 2,5 t

Span: 32,5 mt

Grab: bivalve 8

Pit crane: 70 t/h

Operation: automatic, manual only for maintenance or emergency

PROJECT PONTENOSSA S.P.A.

Year: 2016
Client: Pontenossa S.p.a.

Final Client: Pontenossa S.p.a.

Location: Bergamo, Italy

Waste processed:
treatment of steel dust and zinc materials
Plant capacity: 250.000 tpa

Status of the plant: full operation

Crane
1 Reception Crane

Capacity: 5+5 t

Span: 20 mt

Grab: bivalve 2

Pit crane: 50 t/h

Operation: Manual with cameras

PROJECT ROBECCO

Year: 2017
Client: CAP HOLDING

Final Client: AME ACQUE (state water company)

Location: Milano, Italy

Waste processed: Treatment of sludge remediation

Plant capacity: 100.000 tpa

Status of the plant: full operation

Crane
1 Reception Crane

Capacity: 30 t

Span: 20 mt

Grab: bivalve 1

Pit crane: 30 t/h

Operation: automatic, manual only for maintenance or emergency

PROJECT PONTENOSSA S.P.A.

Year: 2017
Client: Pontenossa S.p.a.

Final Client: Pontenossa S.p.a.

Location: Bergamo, Italy

Waste processed:
treatment of steel dust and zinc materials
Plant capacity: 250.000 tpa

Status of the plant: full operation

Crane
1 Reception Crane

Capacity: 7+7 t

Span: 20 mt

Grab: bivalve 5

Pit crane: 50 t/h

Operation: automatic

PROJECT MONTALE

Year: 2018
Client: Ladurner S.p.a.

Final Client: Ladurner S.p.a.

Location: Montale (PT), Italy

Waste processed: waste to energy plant

Plant capacity: 250.000 tpa

Status of the plant: full operation

Crane
1 Reception Crane

Capacity: 5 t

Span: 17 mt

Grab: bivalve 3

Pit crane: 30 t/h

Operation: automatic, manual only for maintenance or emergency

Cranes
1 Crane for drosses

Capacity: 3 t

Span: 17 mt

Grab: polip 1,5

Pit crane: 10 t/h

Operation: automatic, manual only for maintenance or emergency

PROJECT SINGAPORE

Year: 2019
Client: JONO GROUP (CHN)

Final Client:
JE SYNERGY ENGINEERING PTE LTD
Location: Singapore (SGP)

Waste processed: Household Waste, MSW

Plant capacity: 300.000 tpa

Status of the plant: under construction

Crane
1 Reception Crane

Capacity: 14 t

Span: 32 mt

Grab: bivalve 8

Pit crane: 60 t/h

Operation: automatic, manual only for maintenance or emergency

Cranes
1 Process Crane

Capacity: 16 t

Span: 32 mt

Grab: bivalve 12

Pit crane: 100 t/h

Operation: automatic, manual only for maintenance or emergency

PROJECT BRIDGWATER

Year: 2019/2020
Client:
STC Power UK Ltd (uk)
Final Client:
Shapoorji Pallonji Group
Location: BRIDGWATER (GB)

Waste processed: waste to energy plant, CDR

Plant capacity: 300.000 tpa

Status of the plant: full operation

Crane
2 Reception Crane

Capacity: 8 t

Span: 13 mt

Grab: POLIP 5

Pit crane: 30 t/h

Operation: automatic, manual only for maintenance or emergency

Cranes
1 Mantenance Crane

Capacity: 15 t

Span: 10 mt

Operation: manual only for maintenance or emergency

PROJECT SHANG HAI

Year: 2020
Client: JONO GROUP (CHN)

Final Client: Shang Hai Municipality

Location: Shang Hai (CHN)

Waste processed: waste to energy plant, CDR

Plant capacity: 300.000 tpa

Status of the plant: full operation

Crane
1 Reception and Process Crane

Capacity: 16 t

Span: 33 mt

Grab: POLIP 10

Pit crane: 45 t/h

Operation: automatic, manual only for maintenance or emergency

PROJECT SANTHIA’

Year: 2020
Client: ENTSORGA (IT)

Final Client: IREN Group

Location: SANTHIA’ (Italy)

Waste processed: biomethane by using anaerobic digestion

Plant capacity: 100.000 tpa

Status of the plant: full operation

Crane
1 Reception and Process Crane

Capacity: 10 t

Span: 21 mt

Grab: VIVALVE 8

Pit crane: 30 t/h

Operation: automatic, manual only for maintenance or emergency